No. |
Date |
Production/ Construction Name |
Place of order |
18 |
2020.04 |
Production and purchase of fine & superfine screen driving shaft |
Environmental corporation of Gwangju |
17 |
2020.03 |
Installation of conveyor belt |
SM BURE co.,Ltd |
16 |
2020.03 |
Improvement in outdoor storage tank discharge facility in sewage sludge recycling plant |
Environmental corporation of Gwangju |
15 |
2020.02 |
Production of parts of the 1-step final settling sludge collector reducer |
Environmental corporation of Gwangju |
14 |
2020.02 |
Repair, production & installation of reducer |
Environmental corporation of Gwangju |
13 |
2019.12 |
Processing of surplus sludge pump shaft in the initial settling zone of the 1st sewage treatment plant |
Environmental corporation of Gwangju |
12 |
2019.11 |
Installation of safety handrail in the settling zone with sloped plates |
Environmental corporation of Gwangju |
11 |
2019.08 |
Production & installation of overbridge in digestion tank |
Environmental corporation of Gwangju |
10 |
2019.06 |
Production of the cart for high-pressure washer |
Environmental corporation of Gwangju |
9 |
2019.05 |
Repair of the 2-step initial settling sludge collector in sewage treatment plant |
Environmental corporation of Gwangju |