PERFORMANCE

Main performance

No. Date Production/ Construction Name Place of order
18 2020.04 Production and purchase of fine & superfine screen driving shaft Environmental corporation of Gwangju
17 2020.03 Installation of conveyor belt SM BURE co.,Ltd
16 2020.03 Improvement in outdoor storage tank discharge facility in sewage sludge recycling plant Environmental corporation of Gwangju
15 2020.02 Production of parts of the 1-step final settling sludge collector reducer Environmental corporation of Gwangju
14 2020.02 Repair, production & installation of reducer Environmental corporation of Gwangju
13 2019.12 Processing of surplus sludge pump shaft in the initial settling zone of the 1st sewage treatment plant Environmental corporation of Gwangju
12 2019.11 Installation of safety handrail in the settling zone with sloped plates Environmental corporation of Gwangju
11 2019.08 Production & installation of overbridge in digestion tank Environmental corporation of Gwangju
10 2019.06 Production of the cart for high-pressure washer Environmental corporation of Gwangju
9 2019.05 Repair of the 2-step initial settling sludge collector in sewage treatment plant Environmental corporation of Gwangju