No. |
Date |
Production/ Construction Name |
Place of order |
24 |
2020.12 |
Production and installation of Bukdangjin-Godeok 2-step C.Tr bushing finishing plate |
KAPES, INC. |
23 |
2020.06 |
Maintenance of Taean IGCC turbine assistant equipment |
Taean thermoelectric power plant |
22 |
2020.05 |
Safety foothold installation & lagging material installation |
Hanbit No.3 power plant |
21 |
2020.05 |
Scaffold instalaltion |
Hanbit No.3 power plant |
20 |
2020.04 |
Maintenance and repair of crane & hoist |
Hanbit No.1~3 power plant |
19 |
2020.02 |
Production of pipe assembly body for seawater electrolysis facility |
Hanool No.2 power plant |
18 |
2019.12 |
Installation duct heat insulation for desulfurizer |
Dangjin thermoelectric power plant |
17 |
2019.11 |
Lift production & installation |
Kori nuclear power plant |
16 |
2019.11 |
Installation of the work & storage table for inlet vertical pumping work |
Wolsong No. 3 power plant |
15 |
2019.10 |
Production of beam assay |
Saewool No.1 power plant |