PERFORMANCE

Main performance

No. Date Production/ Construction Name Place of order
14 2019.08 Production of extension joint Hanool No.3 power plant
13 2019.07 Production & installation of conveyor belt safety cover Taean thermoelectric power plant
12 2019.03 Bearing housing Hanbit No.2 office
11 2018.12 Production & installation of ash water pump Hadong thermoelectric power plant
10 2018.11 Production of the reducer gear coupling of coal treatment equipment Korea Western Power Co., Ltd.
9 2018.10 Production of RCP lift frame KEPCO KPS nuclear power maintenance technology center
8 2018.09 Production of wire sling & lift frame KEPCO KPS nuclear power maintenance technology center
7 2018.08 Production of flange Wolsong No.2 power plant
6 2018.05 Production of stand moving cart Hanbit No.2 power plant
5 2018.02 Production of PAB Normal Supply Fan Shaft Hanbit No.2 power plant