PERFORMANCE

Main performance

No. Date Production/ Construction Name Place of order
24 2020.12 Production and installation of Bukdangjin-Godeok 2-step C.Tr bushing finishing plate KAPES, INC.
23 2020.06 Maintenance of Taean IGCC turbine assistant equipment Taean thermoelectric power plant
22 2020.05 Safety foothold installation & lagging material installation Hanbit No.3 power plant
21 2020.05 Scaffold instalaltion Hanbit No.3 power plant
20 2020.04 Maintenance and repair of crane & hoist Hanbit No.1~3 power plant
19 2020.02 Production of pipe assembly body for seawater electrolysis facility Hanool No.2 power plant
18 2019.12 Installation duct heat insulation for desulfurizer Dangjin thermoelectric power plant
17 2019.11 Lift production & installation Kori nuclear power plant
16 2019.11 Installation of the work & storage table for inlet vertical pumping work Wolsong No. 3 power plant
15 2019.10 Production of beam assay Saewool No.1 power plant